Welcome to Refwin.com Sign In Join Free Home Inquiry Contact Mobile Publications Free E-Weekly News
  • Directory
  • Price
  • Market
  • Buy
  • News
  • Calendar
  • Dictionary
Company News Industry News Refwin in the News Home > News

POSCO Gwangyang No.3 Blast Furnace Reborn into a Smart & Sustainable Furnace

2020-07-17

Jul. 17, 2020 - POSCO Gwangyang No.3 Blast Furnace has completed transformation into a smart and sustainable blast furnace.

On July 10, POSCO (CEO Jeong-Woo Choi) held a Blow-In ceremony at the No.3 Blast Furnace site of Gwangyang Works to commence the third operation of the furnace on completing its second refurbishment*.

* Refurbishment: A maintenance operation conducted after extinguishing the fire inside a blast furnace to replace the internal firebricks and renew some parts of the facility.


Through the second refurbishment, Gwangyang No.3 Blast Furnace has been transformed into a super-gigantic, smart, and also sustainable furnace. The maintenance project has boosted its internal capacity to 5,500m³ from 4,600m³, which has, in turn, improved productivity by 25%, amounting to 4.6 million tons per year. Another significant change is that it has prolonged facility lifespan, reduced carbon emissions, and cut costs. By introducing smart technology with AI, POSCO has taken the stability of steelworks operation and quality to the next level. It also has strengthened sustainability of the Blast Furnace’s with investment in gas-cleaning facilities and water resource facilities.


The refurbishment of Gwangyang No.3 Blast Furnace lasted for one year and eight months with a total investment of 400 billion KRW and 230,000 workers yearly. Despite the COVID-19 issue, the project proceeded as planned without a single case of infection. POSCO’s business partners, who were equipped with additional employees and facilities in line with the Blow-In of the renovated furnace, are also in full swing and revitalize the local economy.


POSCO has already secured the minimum order required to operate the Gwangyang No.3 Blast Furnace and plans to make every effort to resume operation to its ordinary level promptly so that client companies would keep on their business. The steel demand slump that the COVID-19 pandemic has imposed is yet to be recovered, and steel prices are still low. However, POSCO plans to minimize costs and secure profitability by winning maximum sales orders.


At the Blow-In ceremony, POSCO CEO Jeong-Woo Choi said, “Gwangyang No.3 Blast Furnace produced 97 million tons of molten iron for 29 years and three months, since its first operation in December 1990. It has served as a foundation for POSCO’s growth, as well as for the advancement of demand industry of Korea. A blast furnace is a facility that produces steel, the rice of the industry, and is a symbol of harmony, cooperation, and challenge. I sincerely hope the Blow-In today will serve as a momentum to overcome the economic crisis caused by COVID-19, marking the ‘restart’ of POSCO and South Korea’s manufacturing industry.”


With the restart of Gwangyang No.3 Blast Furnace, POSCO possesses a total of four “smart furnaces” — two in Pohang and Gwangyang, respectively. A blast furnace that has more than 5,500㎥ internal capacity is considered a super-gigantic furnace, and as of present, there are 15 super-gigantic furnaces around the world. Among them, POSCO has a total of six super-gigantic furnaces: two in Pohang and four in Gwangyang, including Gwangyang No.1, which is the world’s largest blast furnace (with 6000㎥ internal capacity). With these super-gigantic furnaces, POSCO is consolidating its status in the steel industry with world-class technology.

About Us Site Map Service Our Partners Links Inquiry Contact FAQ Privacy Statement Technical Support

Sponsored by: ACRI (The Association of China Refractories Industry), Tangshan YinNaiLian E-Business Co., Ltd.

Copyright © 2005-2020 Refractories Window All Rights Reserved

Tel: +86-315-5918500 Fax: +86-315-5918828 Email: info@refwin.com

ICP经营许可证编号: 冀B2-20060049 ICP备案号: 冀ICP备17015545号

冀公网安备 13024002000198号 营业执照