Welcome to Refwin.com Sign In Join Free Home Inquiry Contact Mobile Publications Free E-Weekly News
  • Directory
  • Price
  • Market
  • Buy
  • News
  • Calendar
  • Dictionary
Company News Industry News Refwin in the News Home > News

Power outage affecting production at Paragominas and Alunorte

2020-06-28

Jun. 28, 2020 - Three power transmission towers overturned, cutting the power supply to Hydro’s Paragominas bauxite mine and temporarily halting production. The mine is in the state of Pará in northern Brazil.



Work to repair the towers has started and regular power supply to Paragominas is expected to resume within two to three weeks.


The Paragominas mine delivers bauxite to the Alunorte alumina refinery in Barcarena via a 244-kilometer-long pipeline.


Production at Alunorte during this period will be reduced to between 50-70% of full capacity to balance the bauxite inventories. 


There were no injuries to people nor damage to the environment or other production assets as a result of the incident. Hydro does not expect significant customer impact from the power outage. 


Hydro is taking all necessary measures to restore power and normal operations as soon as possible, following necessary procedures and guidelines ensuring safe operations related to the Covid-19 situation in Brazil.


Hydro is cooperating with local authorities to determine the cause of the incident. Initial findings show that some parts of the transmission towers have been removed, causing the three power transmission towers to overturn and leading to the power outage.
About Us Site Map Service Our Partners Links Inquiry Contact Privacy Statement Versions Record

Sponsored by: ACRI (The Association of China Refractories Industry), Tangshan YinNaiLian E-Business Co., Ltd.

Copyright © 2005-2020 Refractories Window All Rights Reserved

Tel: +86-315-5918500 Fax: +86-315-5918828 Email: info@refwin.com

ICP经营许可证编号: 冀B2-20060049 ICP备案号: 冀ICP备11009155号-2

冀公网安备 13024002000198号 营业执照