Welcome to Refwin.com Sign In Join Free Home Inquiry Contact Mobile Publications Free E-Weekly News
  • Directory
  • Price
  • Market
  • Buy
  • News
  • Calendar
  • Dictionary
Company News Industry News Refwin in the News Home > News

Tulachermet and Danieli Corus sign contract for Top Charging Unit for Blast Furnace No. 3

2021-10-01

Oct. 1, 2021 - Russian steel producer Tulachermet has awarded an order for a new Top Charging Unit for the Blast Furnace No. 3 at their integrated steel plant in Tula to Danieli Corus. The furnace will be upgraded to chute-based charging as part of a modernization project, preparing it for a next campaign at increased productivity and efficiency.


The DANCU distributor will for the heart of the new burdening system. This type of distributor was developed based on hydraulics with the objective of reducing maintenance time and complexity. Redundancy and the use of "failure-free" components have led to a marked increase in availability. The reduction in the number of moving parts makes this charging unit the most robust design available. It is the only design with a proven capability of charging hot sinter with temperatures up to 700 °C.


The upgraded Blast Furnace No. 3 is scheduled to be put back in operation in 2022 with a design productivity of 6000 tonnes of hot metal per day.

About Us Site Map Service Our Partners Links Inquiry Contact FAQ Privacy Statement Technical Support

Sponsored by: ACRI (The Association of China Refractories Industry), Tangshan YinNaiLian E-Business Co., Ltd.

Copyright © 2005-2020 Refractories Window All Rights Reserved

Tel: +86-315-5918500 Fax: +86-315-5918828 Email: info@refwin.com

ICP经营许可证编号: 冀B2-20060049 ICP备案号: 冀ICP备17015545号

冀公网安备 13024002000198号 营业执照