2020-09-30
Sep. 29, 2020 - Austrian steelmaker Voestalpine has announced that it restarted the small blast furnace in Linz which had been shut down since March due to reduced demand caused by the Covid-19 pandemic. The blast furnace will return to normal operation in early October, as the blast furnace must be gradually brought up to its operating temperature so that it heats up evenly.
Voestalpine stated that at least 100 m3 of coke was cleared out and maintenance work was carried out at the blast furnace after the shutdown.
Sponsored by: ACRI (The Association of China Refractories Industry), Tangshan YinNaiLian E-Business Co., Ltd.
Copyright © 2005-2020 Refractories Window All Rights Reserved
Tel: +86-315-5918500 Fax: +86-315-5918828 Email: info@refwin.com
ICP经营许可证编号: 冀B2-20060049 ICP备案号: 冀ICP备17015545号